INNOVATIVE EXHAUST SYSTEM DESIGN

 

2JCP customers seek our help with engineering solutions on a design only and build to spec basis.

Whether a complete Acoustic solution, or elements of a wider Acoustic project, we work closely with customers to ensure that the total solution addresses all of their issues with the best value features being incorporated.

One such project was undertaken with an Industrial Gas Turbine OEM for a Power Generation facility in Russia. Their goal was to reduce Gas Turbine noise levels in the most cost efficient manner, maintaining Energy output, meeting the demanding seismic and extreme low ambient conditions. Complying with regional design codes and regulations, 2JCP designed a compact, quick install Exhaust System to meet these challenges.

 

Project Type: Build to Specification

Location: Russia

Gas Turbine Type: 5 MW Power Generation Plant

Finished in: 2016